{
  "version": "1.0",
  "cutoff": "2026-10-13",
  "records": [
    {
      "id": "S01",
      "title": "Vogtle Unit 4 enters commercial operation",
      "publisher": "Georgia Power",
      "source_type": "primary-company",
      "published": "2024-04-29",
      "event_date": "2024-04-29",
      "statistical_period": "Unit 3: 2023-07-31; Unit 4: 2024-04-29",
      "location": "main announcement paragraphs 1-3; forward-looking note",
      "geography": "Georgia, United States",
      "units": "dates; years",
      "read_date": "2026-10-13",
      "support_and_limits": "Confirms operating dates and operator identity. Expected service life is forward-looking; achieved lifetime and returns are not established.",
      "url": "https://www.georgiapower.com/news-hub/press-releases/vogtle-unit-4-enters-commercial-operation.html"
    },
    {
      "id": "S02",
      "title": "Form 8-K, Item 8.01 Other Events, Southern Company and Georgia Power",
      "publisher": "Southern Company / Georgia Power, filed with SEC",
      "source_type": "primary-regulatory-filing",
      "published": "2024-04-29",
      "event_date": "2024-04-29",
      "statistical_period": "2024-04-29",
      "location": "Item 8.01; signatures",
      "geography": "Georgia, United States",
      "units": "date",
      "read_date": "2026-10-13",
      "support_and_limits": "Same-day securities filing corroborates Unit 4 entering service. It does not establish costs, profit or future performance.",
      "url": "https://www.sec.gov/Archives/edgar/data/92122/000009212224000039/so-20240429.htm"
    },
    {
      "id": "S03",
      "title": "Plant Vogtle Unit 4 Achieves Commercial Operation",
      "publisher": "Bechtel",
      "source_type": "primary-company",
      "published": "2024-04-29",
      "event_date": "2017 and 2024-04-29",
      "statistical_period": "Vogtle construction through 2024",
      "location": "announcement; Background",
      "geography": "United States",
      "units": "workers; dates",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports Bechtel's 2017 appointment and project staffing. Project figures and supplier assessments cannot establish global industry outcomes.",
      "url": "https://www.bechtel.com/press-releases/plant-vogtle-unit-4-achieves-commercial-operation/"
    },
    {
      "id": "S04",
      "title": "9 Notable Facts About the World’s First Nuclear Power Plant - EBR-I",
      "publisher": "US Department of Energy, Office of Nuclear Energy",
      "source_type": "primary-official-history",
      "published": "2019-06-18",
      "event_date": "1951-12-20; 1954",
      "statistical_period": "historical milestones",
      "location": "facts 1-3",
      "geography": "United States and former USSR",
      "units": "watts; megawatts; dates",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports EBR-I's 1951 usable-electricity milestone. This definition differs from national-grid supply and full-scale commercial generation.",
      "url": "https://www.energy.gov/ne/articles/9-notable-facts-about-worlds-first-nuclear-power-plant-ebr-i"
    },
    {
      "id": "S05",
      "title": "International Conference on Fifty Years of Nuclear Power - the Next Fifty Years, IAEA-CN-114, Announcement and Call for Papers",
      "publisher": "IAEA",
      "source_type": "primary-official-conference",
      "published": "undisclosed; conference held 2004-06-27 to 2004-07-02",
      "event_date": "1954-06",
      "statistical_period": "1954 milestone",
      "location": "PDF page 1, Background",
      "geography": "Obninsk, former USSR",
      "units": "year and month",
      "read_date": "2026-10-13",
      "support_and_limits": "Undated announcement for a 2004 conference supports the June 1954 grid milestone. It does not establish a specific day.",
      "url": "https://www-pub.iaea.org/Mtcd/Meetings/PDFplus/2004/cn114ann.pdf"
    },
    {
      "id": "S06",
      "title": "History made as final fuel leaves iconic nuclear plant",
      "publisher": "Sellafield Ltd / UK Nuclear Decommissioning Authority",
      "source_type": "primary-operator-government",
      "published": "2019-09-03",
      "event_date": "1956; 2003; 2011; 2019-09",
      "statistical_period": "1956-2019 operating and defuelling lifecycle",
      "location": "announcement paragraphs; decommissioning details",
      "geography": "United Kingdom",
      "units": "years; fuel rods; dates",
      "read_date": "2026-10-13",
      "support_and_limits": "Documents Calder Hall's generation, defuelling and subsequent stages. Completed fuel removal does not establish completed decommissioning.",
      "url": "https://www.gov.uk/government/news/history-made-as-final-fuel-leaves-iconic-nuclear-plant"
    },
    {
      "id": "S07",
      "title": "History of the International Atomic Energy Agency: The First Forty Years",
      "publisher": "David Fischer, published by IAEA",
      "source_type": "institution-published-historical-research",
      "published": "1997-09",
      "event_date": "1960s-1995",
      "statistical_period": "historical retrospective through 1997",
      "location": "printed pages 146-147 and 158; PDF pages 158-159 and 170; copyright PDF page 8",
      "geography": "global, with advanced-economy examples",
      "units": "years; qualitative history",
      "read_date": "2026-10-13",
      "support_and_limits": "Historical research supports commercialization and order cycles. The author does not represent IAEA; old forecasts are not current data.",
      "url": "https://www-pub.iaea.org/MTCD/Publications/PDF/Pub1032_web.pdf"
    },
    {
      "id": "S08",
      "title": "5 Facts to Know About Three Mile Island",
      "publisher": "US Department of Energy, Office of Nuclear Energy",
      "source_type": "primary-official-history",
      "published": "2022-05-04",
      "event_date": "1979-03-28",
      "statistical_period": "1979 accident and aftermath",
      "location": "facts 2 and 4",
      "geography": "United States",
      "units": "date",
      "read_date": "2026-10-13",
      "support_and_limits": "DOE's retrospective supports accident mechanisms and training changes. The inaccessible NRC page and additional health conclusions are excluded.",
      "url": "https://www.energy.gov/ne/articles/5-facts-know-about-three-mile-island"
    },
    {
      "id": "S09",
      "title": "The Chernobyl Accident: Updating of INSAG-1, Safety Series 75-INSAG-7",
      "publisher": "International Nuclear Safety Advisory Group / IAEA",
      "source_type": "primary-expert-accident-review",
      "published": "1992-11",
      "event_date": "1986-04-26",
      "statistical_period": "1986 accident reviewed by 1992",
      "location": "Introduction; conclusions; Annex I printed pp. 85-88 (PDF pp. 95-98); copyright PDF p.4",
      "geography": "former USSR / Ukraine",
      "units": "date; qualitative safety assessment",
      "read_date": "2026-10-13",
      "support_and_limits": "INSAG-7 supports design, regulation and safety-culture findings. The accident investigation does not characterize every reactor design.",
      "url": "https://pub.iaea.org/MTCD/publications/PDF/Pub913e_web.pdf"
    },
    {
      "id": "S10",
      "title": "The Fukushima Daiichi Accident, Technical Volume 2: Safety Assessment",
      "publisher": "IAEA",
      "source_type": "primary-expert-accident-review",
      "published": "2015-08",
      "event_date": "2011-03-11",
      "statistical_period": "2011 accident; investigation through 2015",
      "location": "Introduction pp.1-2; sections 2.1.7-2.1.8 and 2.2.14; PDF pp.12-13, 57-61, 92",
      "geography": "Japan; lessons relevant globally",
      "units": "date; qualitative safety functions",
      "read_date": "2026-10-13",
      "support_and_limits": "The 2015 technical volume supports external-event and defence findings. It provides neither present accident probabilities nor legal blame allocation.",
      "url": "https://www-pub.iaea.org/MTCD/Publications/PDF/AdditionalVolumes/P1710/Pub1710-TV2-Web.pdf"
    },
    {
      "id": "S11",
      "title": "Convention on Nuclear Safety: Introduction to the CNS and Its Associated Rules of Procedure and Guidelines",
      "publisher": "IAEA",
      "source_type": "primary-official-treaty-guide",
      "published": "2017-01",
      "event_date": "1994-06-17; 1996-10-24",
      "statistical_period": "historical treaty adoption and entry into force",
      "location": "CNS Brochure Introduction, printed page 2; cover January 2017",
      "geography": "contracting parties globally",
      "units": "dates",
      "read_date": "2026-10-13",
      "support_and_limits": "The 2017 brochure supports treaty dates and obligation scope. Historical party counts are not presented as current.",
      "url": "https://www.iaea.org/sites/default/files/19/09/19-00679e_web_cns.pdf"
    },
    {
      "id": "S12",
      "title": "Update on the Flamanville EPR",
      "publisher": "EDF",
      "source_type": "primary-company",
      "published": "2022-12-16",
      "event_date": "2022-12-16 schedule/cost update",
      "statistical_period": "project forecast at 2022-12-16",
      "location": "opening paragraphs; industrial milestones; footnote 2",
      "geography": "France",
      "units": "billion EUR, 2015 prices, excluding interim interest",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports the 2022 estimate and weld-process issue. EUR 13.2 billion uses 2015 prices, excluding construction-period interest; final costs are unproven.",
      "url": "https://www.edf.fr/groupe-edf/espaces-dedies/journalistes/tous-les-communiques-de-presse/point-dactualite-sur-lepr-de-flamanville"
    },
    {
      "id": "S13",
      "title": "Update on the Flamanville EPR: the reactor produces its first electrons on the national electricity grid",
      "publisher": "EDF",
      "source_type": "primary-company",
      "published": "2024-12-21",
      "event_date": "2024-12-21",
      "statistical_period": "first nuclear reaction 2024-09-03; first grid connection 2024-12-21",
      "location": "announcement paragraphs 1-4",
      "geography": "France",
      "units": "MW; dates; local time",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports first grid connection and further testing in December 2024. It does not establish full-power or sustained performance.",
      "url": "https://www.edf.fr/en/the-edf-group/dedicated-sections/journalists/all-press-releases/update-on-the-flamanville-epr-the-reactor-produces-its-first-electrons-on-the-national-electricity-grid"
    },
    {
      "id": "S14",
      "title": "Ageing Management and Development of a Programme for Long Term Operation of Nuclear Power Plants, SSG-48",
      "publisher": "IAEA",
      "source_type": "primary-official-safety-guide",
      "published": "2018-11",
      "event_date": "not applicable",
      "statistical_period": "technical safety guide",
      "location": "Original PDF printed pp. 1-3, 47, 55-61; paras 1.2, 5.67, 7.13-7.39. Both PDF and IAEA online edition were actually read.",
      "geography": "global technical guidance",
      "units": "neutron fluence; fatigue criteria; no market units",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports ageing assessments and auditable documentation. Technical guidance does not substitute for plant-specific regulatory permission.",
      "url": "https://www-pub.iaea.org/MTCD/Publications/PDF/P1814_web.pdf"
    },
    {
      "id": "S15",
      "title": "NRC Renews Browns Ferry Operating License, No. 25-065",
      "publisher": "US Nuclear Regulatory Commission",
      "source_type": "primary-regulator",
      "published": "2025-12-12",
      "event_date": "2025-12-12",
      "statistical_period": "licence renewal review safety July 2025, environment August 2025",
      "location": "one-page announcement",
      "geography": "United States",
      "units": "operating years; dates",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports Browns Ferry's 2025 permissions and reviews. Plant-specific permission cannot establish 80-year operation for all reactors.",
      "url": "https://ww2.nrc.gov/sites/default/files/cdn/doc-collection-news/2025/25-065.pdf"
    },
    {
      "id": "S16",
      "title": "What are Small Modular Reactors (SMRs)?",
      "publisher": "Joanne Liou, IAEA",
      "source_type": "primary-official-explanation",
      "published": "2023-09-13",
      "event_date": "2020-05 commercial operation example",
      "statistical_period": "status as of 2023 article",
      "location": "definition; Advantages; What is the status of SMRs?",
      "geography": "global",
      "units": "MW(e) per unit",
      "read_date": "2026-10-13",
      "support_and_limits": "The 2023 article supports SMR definition, examples and economic uncertainty. Historic design counts are not current totals.",
      "url": "https://www.iaea.org/newscenter/news/what-are-small-modular-reactors-smrs"
    },
    {
      "id": "S17",
      "title": "Biden-Harris Administration Announces 6 Contracts to Spur America’s Domestic HALEU Supply Chain as Part of Investing in America Agenda",
      "publisher": "US Department of Energy, Office of Nuclear Energy",
      "source_type": "primary-government-procurement",
      "published": "2024-10-08",
      "event_date": "2024-10-08",
      "statistical_period": "framework awards announced 2024",
      "location": "announcement paragraphs; six awardees; contract terms",
      "geography": "United States",
      "units": "USD; contract years",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports six 2024 deconversion frameworks. Contract ceilings and eligibility establish neither material delivery nor realised revenue.",
      "url": "https://www.energy.gov/ne/articles/biden-harris-administration-announces-6-contracts-spur-americas-domestic-haleu-supply"
    },
    {
      "id": "S18",
      "title": "Sizewell C gets green light with final investment decision",
      "publisher": "UK Department for Energy Security and Net Zero",
      "source_type": "primary-government-project",
      "published": "2025-07-22",
      "event_date": "2025-07-22",
      "statistical_period": "FID July 2025; estimated construction cost at 2024 prices",
      "location": "financing explanation; Notes to editors",
      "geography": "United Kingdom",
      "units": "billion GBP, 2024 prices",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports Sizewell C's decision, financing and target. Costs in 2024 prices and projected benefits are not realised results.",
      "url": "https://www.gov.uk/government/news/sizewell-c-gets-green-light-with-final-investment-decision"
    },
    {
      "id": "S19",
      "title": "Nuclear Power in a Clean Energy System",
      "publisher": "IEA",
      "source_type": "primary-institutional-analysis",
      "published": "2019-05",
      "event_date": "not applicable",
      "statistical_period": "IEA 2019 report using fleet status circa 2018",
      "location": "Policy and regulatory decisions; ageing reactors; security",
      "geography": "global advanced economies",
      "units": "years; GW; qualitative assessment",
      "read_date": "2026-10-13",
      "support_and_limits": "The 2019 report informs ageing-fleet history. Its capacity and average-age figures are not treated as current.",
      "url": "https://www.iea.org/reports/nuclear-power-in-a-clean-energy-system"
    },
    {
      "id": "S20",
      "title": "The Path to a New Era for Nuclear Energy, Executive Summary",
      "publisher": "IEA",
      "source_type": "primary-institutional-analysis",
      "published": "2025-01-16",
      "event_date": "not applicable",
      "statistical_period": "2025 report; 2017-2024 starts; forecast scenarios to 2050",
      "location": "Diversifying supply chains; financing; cash-flow visibility",
      "geography": "global",
      "units": "GW; USD; years; percentages",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports financing and enrichment concentration in 2025. Capacity, revenue and future scenarios measure different things.",
      "url": "https://www.iea.org/reports/the-path-to-a-new-era-for-nuclear-energy/executive-summary"
    },
    {
      "id": "S21",
      "title": "Bechtel and USC Partner to Build South Carolina’s Nuclear Workforce",
      "publisher": "Bechtel / University of South Carolina partnership announcement",
      "source_type": "primary-company-programme",
      "published": "2026-10-06",
      "event_date": "2026-10-06",
      "statistical_period": "programme announcement as of cutoff",
      "location": "announcement and fund objectives",
      "geography": "South Carolina, United States",
      "units": "programme; date",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports the October 2026 workforce programme. Graduate numbers, resolved shortages and productivity gains are not demonstrated.",
      "url": "https://www.bechtel.com/press-releases/bechtel-and-usc-partner-to-build-south-carolinas-nuclear-workforce/"
    },
    {
      "id": "S22",
      "title": "Bechtel and TerraPower Begin Construction at Natrium Kemmerer Unit 1",
      "publisher": "Bechtel",
      "source_type": "primary-company",
      "published": "2026-04-23",
      "event_date": "2026-04-23",
      "statistical_period": "project milestone April 2026",
      "location": "opening announcement; early works and field execution",
      "geography": "Wyoming, United States",
      "units": "date; construction stage",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports April 2026 construction progress and EPC role. Commercial operation, competitive cost and regulatory firsts are not established.",
      "url": "https://www.bechtel.com/press-releases/bechtel-and-terrapower-begin-construction-at-natrium-kemmerer-unit-1/"
    },
    {
      "id": "S23",
      "title": "Advantages and Challenges of Nuclear Energy",
      "publisher": "US Department of Energy, Office of Nuclear Energy",
      "source_type": "primary-government-explanation",
      "published": "2024-06-11",
      "event_date": "not applicable",
      "statistical_period": "2024 explanatory snapshot",
      "location": "Used Fuel Transportation, Storage and Disposal",
      "geography": "United States",
      "units": "qualitative policy and project planning",
      "read_date": "2026-10-13",
      "support_and_limits": "The 2024 US explanation supports spent-fuel planning and community involvement. Global policy uniformity and completed disposal are unproven.",
      "url": "https://www.energy.gov/ne/articles/advantages-and-challenges-nuclear-energy"
    },
    {
      "id": "S24",
      "title": "60 years since the day that changed the nuclear industry",
      "publisher": "Sellafield Ltd, published on GOV.UK",
      "source_type": "primary-operator-government-history",
      "published": "2016-10-17",
      "event_date": "1956-10-17",
      "statistical_period": "1956 opening milestone",
      "location": "opening paragraph and dated milestone",
      "geography": "United Kingdom",
      "units": "dates",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports Calder Hall's 1956 opening. The article's conflicting, unqualified first-grid claim is excluded.",
      "url": "https://www.gov.uk/government/news/60-years-since-the-day-that-changed-the-nuclear-industry"
    },
    {
      "id": "V01",
      "title": "2025 Annual Report",
      "publisher": "Cameco",
      "source_type": "company_annual_report",
      "published": "Not stated",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025 and year-end commitments",
      "location": "Operational and marketing performance; Fuel services; Contracting",
      "geography": "Global / Canadian operations",
      "units": "million kgU of UF6",
      "read_date": "2026-10-13",
      "support_and_limits": "Year-end conversion-service commitments totalled about 83 million kgU of UF6; Westinghouse participates as a subcontractor in the KHNP-led Dukovany project and has fuel-fabrication responsibilities for a specified period. Limit: Conversion kgU differs from enrichment SWU; the page does not state its publication date; Cameco's ownership-share figures are not Westinghouse's 100% revenue.",
      "url": "https://www.cameco.com/invest/financial-information/annual-reports/2025"
    },
    {
      "id": "V02",
      "title": "Management discussion and analysis for the quarter ended June 30, 2026",
      "publisher": "Cameco / SEC filing",
      "source_type": "company_interim_report",
      "published": "Not stated",
      "event_date": "2026-07-30",
      "statistical_period": "Q2 and H1 2026; information as of July 30, 2026",
      "location": "pp.31-33; Westinghouse 2026 Q2 updates; Operating Plants Business",
      "geography": "Global",
      "units": "years; customer reactor coverage",
      "read_date": "2026-10-13",
      "support_and_limits": "Westinghouse Operating Plants includes engineered equipment, reactor services and fuel products and services; Most recurring business is secured in advance under contracts lasting three to more than ten years; Cameco Fuel Services includes UO2, UF6 and heavy-water-reactor fuel bundles. Limit: Management's recurring-business description does not guarantee quarterly growth; customer coverage is not exclusive market share; illustrative economics in this section are not forecasts or guidance; publication date not independently verified.",
      "url": "https://www.sec.gov/Archives/edgar/data/1009001/000119312526326768/d125942dex992.htm"
    },
    {
      "id": "V03",
      "title": "Framatome reports 2025 financial results",
      "publisher": "Framatome",
      "source_type": "company_results_release",
      "published": "2026-03-04",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025",
      "location": "Financial results table and commentary; Installed Base; I&C; footnote",
      "geography": "Global",
      "units": "EUR million",
      "read_date": "2026-10-13",
      "support_and_limits": "2025 revenue was EUR 5,399 million, new orders EUR 5,924 million and EBITDA EUR 665 million; Growth involved EPR projects, fuel, I&C and installed-base services; Major-component work included North America and South Africa; replacement of four steam generators at Flamanville 2 began in November 2025. Limit: Use Framatome's own reporting perimeter; its footnote identifies EUR 641 million under EDF reporting, which must not be mixed with EUR 665 million; avoid the potentially stale ownership boilerplate.",
      "url": "https://www.framatome.com/medias/framatome-reports-2025-financial-results/"
    },
    {
      "id": "V04",
      "title": "Full year 2025 audited financial results",
      "publisher": "Urenco",
      "source_type": "company_results_release",
      "published": "2026-03-12",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025 and 2025 year-end",
      "location": "Financial highlights and Outlook and Order Book",
      "geography": "Global; facilities in four countries",
      "units": "EUR million / EUR billion",
      "read_date": "2026-10-13",
      "support_and_limits": "2025 revenue was EUR 2,096.2 million and the year-end order book EUR 21.3 billion; Contracted orders extend into the 2040s. Limit: The order book spans multiple years rather than current revenue; exchange rates affect its euro value; it is not reactor-equipment revenue or global equipment market share.",
      "url": "https://www.urenco.com/news/global/2026/full-year-2025-audited-results"
    },
    {
      "id": "V05",
      "title": "2025 annual results",
      "publisher": "Orano",
      "source_type": "company_results_release",
      "published": "2026-02-20",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025",
      "location": "Annual results financial highlights",
      "geography": "Global",
      "units": "EUR million",
      "read_date": "2026-10-13",
      "support_and_limits": "2025 group revenue was EUR 5,138 million; A one-off Japanese-utility back-end contract contribution raised the 2024 comparison base; Revised end-of-lifecycle estimates affected 2025 adjusted earnings. Limit: The group includes mining and other activities; group revenue and its annual change do not measure the reactor-maintenance market.",
      "url": "https://www.orano.group/en/news/news-group/2026/february/annual-results-2025"
    },
    {
      "id": "V06",
      "title": "Annual Activity Report 2025, review of key figures by business segment",
      "publisher": "Orano",
      "source_type": "company_annual_report",
      "published": "Not stated",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025",
      "location": "Printed p.56; section 2.5.2.5; online page 56",
      "geography": "Global",
      "units": "EUR million",
      "read_date": "2026-10-13",
      "support_and_limits": "Segments comprise Mining, Front End (Chemistry and Enrichment), and Back End (Recycling, Nuclear Packages and Services, Dismantling and Services, Engineering); Back End revenue was EUR 2,352 million in 2025. Limit: Back End includes recycling, packages and engineering and is not pure decommissioning revenue; publication date is not displayed.",
      "url": "https://www.orano.group/finance-raa/2025/en/56/"
    },
    {
      "id": "V07",
      "title": "BWX Technologies 2025 Form 10-K",
      "publisher": "BWX Technologies / SEC",
      "source_type": "regulatory_filing",
      "published": "2026-02-23",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025; year-end backlog",
      "location": "pp.2-4, 36-37, 64-65 and 90-91; Business; Backlog; Note 3; Segment reporting; signed February 23, 2026",
      "geography": "Global; commercial utility exposure primarily Canada",
      "units": "USD million",
      "read_date": "2026-10-13",
      "support_and_limits": "Commercial Operations revenue was USD 853.070 million in 2025, with approximately USD 1,720 million in year-end backlog; The segment supplies heavy nuclear components, fuel, engineering and maintenance and also includes medical isotope and pharmaceutical-related activities; Kinectrics acquisition closed on May 20, 2025 and entered Commercial Operations; Commercial contracts include fixed-price and time-and-materials arrangements, with large custom-component and service revenue generally recognised over time. Limit: Commercial Operations is not pure civilian nuclear-power revenue; acquisitions affect growth; government and naval nuclear work is separate; backlog methodology need not match peers; date is the report signature date.",
      "url": "https://www.sec.gov/Archives/edgar/data/1486957/000148695726000007/bwxt-20251231.htm"
    },
    {
      "id": "V08",
      "title": "BWX Technologies Reports Second Quarter 2026 Results",
      "publisher": "BWX Technologies",
      "source_type": "company_results_release",
      "published": "2026-08-03",
      "event_date": "2026-06-30",
      "statistical_period": "Q2 and H1 2026; June 30 backlog",
      "location": "Exhibit 4, segment revenues and backlog; revenue commentary",
      "geography": "Global; commercial nuclear and nuclear medicine",
      "units": "USD million",
      "read_date": "2026-10-13",
      "support_and_limits": "Commercial Operations revenue was USD 586.158 million in H1 2026; The segment's June 30 backlog was USD 1,600.454 million; Q2 growth included nuclear components, field services, fuel handling, medical activities and Kinectrics. Limit: Interim results are unaudited, include medical activities and acquisition effects, and should not be annualised by simple doubling.",
      "url": "https://investors.bwxt.com/news-releases/news-release-details/bwx-technologies-reports-second-quarter-2026-results"
    },
    {
      "id": "V09",
      "title": "Curtiss-Wright Reports Fourth Quarter and Full-Year 2025 Financial Results",
      "publisher": "Curtiss-Wright",
      "source_type": "company_results_release",
      "published": "2026-02-11",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025",
      "location": "Condensed consolidated statements; Naval & Power and end-market commentary",
      "geography": "Global",
      "units": "USD million",
      "read_date": "2026-10-13",
      "support_and_limits": "2025 group sales were USD 3,498.372 million; Naval & Power sales were USD 1,503.002 million; Commercial nuclear solutions grew, while the segment also includes naval and process-industry activities. Limit: Neither figure is pure nuclear-power equipment-and-service revenue; total orders and backlog also include aerospace, defence and other business.",
      "url": "https://curtisswright.com/news/press-releases/news-release-details/2026/Curtiss-Wright-reports-fourth-quarter-and-fullyear-2025-financial-results-fullyear-2026-outlook-reflects-higher-sales-operating-margin-expansion-doubledigit-eps-growth-and-strong-free-cash-flow"
    },
    {
      "id": "V10",
      "title": "Naval & Power",
      "publisher": "Curtiss-Wright",
      "source_type": "company_business_page",
      "published": "Not stated",
      "event_date": "Not separately stated",
      "statistical_period": "Current business description viewed 2026-10-13",
      "location": "Commercial nuclear discussion",
      "geography": "Global",
      "units": "Products; no comparable market-share denominator",
      "read_date": "2026-10-13",
      "support_and_limits": "Supplies reactor-coolant-pump technology for AP1000; Provides nuclear products, parts, I&C, testing, field and obsolescence support, alongside defence nuclear business. Limit: Installed-product coverage and self-described leadership do not establish exclusive revenue market share; no publication date is shown.",
      "url": "https://curtisswright.com/organization/naval-power"
    },
    {
      "id": "V11",
      "title": "Doosan Enerbility Signs Steam Turbine Contract with Doosan Skoda Power for Czech Nuclear Power Plant",
      "publisher": "Doosan Enerbility",
      "source_type": "company_contract_announcement",
      "published": "2026-02-19",
      "event_date": "2026-02-16",
      "statistical_period": "Contract for Dukovany units 5 and 6",
      "location": "News, paragraphs 1-4",
      "geography": "Czech Republic; South Korea",
      "units": "KRW billion; two sets",
      "read_date": "2026-10-13",
      "support_and_limits": "A contract of about KRW 320 billion covers two steam-turbine and turbine-control-system sets for Dukovany 5 and 6; The counterparty is Czech subsidiary Doosan Skoda Power; ceremony held February 16, 2026; KHNP signed the principal project contract in June 2025. Limit: An intra-group contract cannot simply be added as sales of both companies; contract value is not current-year revenue or proof of commissioning.",
      "url": "https://www.doosanenerbility.com/en/about/news_board_view?id=21000799&page=0&pageSize=9"
    },
    {
      "id": "V12",
      "title": "Large-Scale Nuclear Components / MMIS",
      "publisher": "Doosan Enerbility",
      "source_type": "company_business_page",
      "published": "Not stated",
      "event_date": "Not separately stated",
      "statistical_period": "Business catalogue viewed 2026-10-13",
      "location": "Large-Scale Nuclear Components and MMIS",
      "geography": "Global",
      "units": "Product categories",
      "read_date": "2026-10-13",
      "support_and_limits": "Products include reactor and internals, steam generators, coolant pumps, pressurisers and fuel-handling equipment; MMIS covers control, monitoring, instrumentation and emergency safety functions. Limit: Do not use the company's unqualified 'largest supplier' claim as a ranking; equipment configurations differ by reactor type.",
      "url": "https://www.doosanenerbility.com/en/business/nuclear_large"
    },
    {
      "id": "V13",
      "title": "Castings & Forgings",
      "publisher": "Doosan Enerbility",
      "source_type": "company_business_page",
      "published": "Not stated",
      "event_date": "Not separately stated",
      "statistical_period": "Business description viewed 2026-10-13",
      "location": "Power Plant Components",
      "geography": "Global; manufacturing in South Korea",
      "units": "Product categories",
      "read_date": "2026-10-13",
      "support_and_limits": "Supplies large castings and forgings for nuclear reactors and steam generators as well as turbine and generator components. Limit: The business also serves other generation technologies and industrial users; no pure nuclear revenue or share is established.",
      "url": "https://www.doosanenerbility.com/en/business/gasting_forging"
    },
    {
      "id": "V14",
      "title": "Services for Operational Power Plants",
      "publisher": "Doosan Enerbility",
      "source_type": "company_business_page",
      "published": "Not stated",
      "event_date": "Not separately stated",
      "statistical_period": "Business description viewed 2026-10-13",
      "location": "Service Offerings",
      "geography": "Global",
      "units": "Service categories",
      "read_date": "2026-10-13",
      "support_and_limits": "Provides component replacement, repair/refurbishment, routine and outage maintenance, upgrades, engineering and I&C replacement. Limit: A service menu identifies capabilities rather than revenue or a specific current contract for every offering.",
      "url": "https://www.doosanenerbility.com/en/business/nuclear_power_plant"
    },
    {
      "id": "V15",
      "title": "About GE Vernova Hitachi Nuclear Energy",
      "publisher": "GE Vernova Hitachi",
      "source_type": "company_business_page",
      "published": "Not stated",
      "event_date": "Not separately stated",
      "statistical_period": "Company description viewed 2026-10-13",
      "location": "What is GVH? and GNF",
      "geography": "Global; United States/Japan/Canada",
      "units": "Business roles",
      "read_date": "2026-10-13",
      "support_and_limits": "The current name is GE Vernova Hitachi Nuclear Energy (GVH); Provides reactor technology, fuel and nuclear services; GE Vernova-led GNF operates fuel plants; Canadian activities support BWRX-300 deployment. Limit: GE Vernova group revenue must not be treated as nuclear-business revenue; the page has no publication date.",
      "url": "https://www.gevernova.com/nuclear/about"
    },
    {
      "id": "V16",
      "title": "Key Operating Results of State Atomic Energy Corporation ROSATOM 2025",
      "publisher": "Rosatom",
      "source_type": "company_annual_operating_results",
      "published": "Not stated",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025",
      "location": "Printed pp.2-5 and 18-19; PDF pp.3-4 and 11; ROSATOM TODAY / SAFE ENERGY / RAW and SNF management",
      "geography": "Russia and international projects",
      "units": "Business activities; kWh only contextual",
      "read_date": "2026-10-13",
      "support_and_limits": "Activities span uranium production, enrichment, fabrication, domestic and international nuclear construction, generation and spent-fuel/radioactive-waste management. Limit: Self-reported rankings are not independent market-share evidence; generation and non-nuclear businesses broaden the group perimeter; total revenue is not an equipment-service market estimate; publication date is not stated.",
      "url": "https://report.rosatom.ru/go_eng/go_rosatom_eng_2025/rosatom_key_2025_eng.pdf"
    },
    {
      "id": "V17",
      "title": "Our services",
      "publisher": "Arabelle Solutions",
      "source_type": "company_business_page",
      "published": "Not stated",
      "event_date": "Not separately stated",
      "statistical_period": "Business description viewed 2026-10-13",
      "location": "Service & retrofit expertise; Overhaul planning; Multi-year agreements",
      "geography": "Global",
      "units": "Service categories",
      "read_date": "2026-10-13",
      "support_and_limits": "Maintains turbines, generators and other turbine-island equipment and supports upgrades and life extension; Services legacy equipment from other manufacturers and offers multi-year agreements. Limit: Supplier support is not regulatory authority to grant life extension; customer or installed-base coverage is not exclusive share.",
      "url": "https://www.arabellesolutions.com/en/our-services"
    },
    {
      "id": "V18",
      "title": "Nuclear Power Capabilities",
      "publisher": "Dongfang Electric Corporation",
      "source_type": "company_business_page",
      "published": "Not stated",
      "event_date": "Not separately stated",
      "statistical_period": "Business description viewed 2026-10-13",
      "location": "Nuclear power section",
      "geography": "China; equipment technologies used in several reactor designs",
      "units": "Business capabilities",
      "read_date": "2026-10-13",
      "support_and_limits": "Has serial-supply capabilities for nuclear-island main equipment and turbine-generator sets for the conventional island. Limit: Group capabilities differ from listed-company financial scope; unqualified leadership/share language is not used; no publication date is shown.",
      "url": "https://www.dongfang.com/ywbt/cygj/ldbj.htm"
    },
    {
      "id": "V19",
      "title": "2026 half-year results",
      "publisher": "Orano",
      "source_type": "company_results_release",
      "published": "2026-07-31",
      "event_date": "2026-06-30",
      "statistical_period": "H1 2026",
      "location": "Financial highlights and production stoppages",
      "geography": "Global",
      "units": "EUR million",
      "read_date": "2026-10-13",
      "support_and_limits": "H1 2026 revenue was EUR 2,696 million and EBITDA EUR 595 million; The company attributed Mining and Front End disruption to exceptional weather. Limit: Group results span multiple activities; do not extrapolate the half-year result; operational attribution is management's explanation.",
      "url": "https://www.orano.group/en/news/news-group/2026/july/2026-half-year-results"
    },
    {
      "id": "V20",
      "title": "2025 annual results management report",
      "publisher": "EDF",
      "source_type": "company_annual_results_management_report",
      "published": "2026-02-20",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025",
      "location": "p.10, Industry and services; sales by Framatome alone",
      "geography": "Global",
      "units": "EUR million",
      "read_date": "2026-10-13",
      "support_and_limits": "EDF reports Framatome sales of EUR 5,372 million and Arabelle Solutions sales of EUR 990 million. Limit: Different from Framatome's own EUR 5,399 million disclosure; this source does not separately explain the EUR 27 million sales difference, so no specific cause is inferred; EDF electricity sales are not equipment-service revenue.",
      "url": "https://www.edf.fr/sites/groupe/files/2026-02/edf-annual-results-2025-management-report.pdf"
    },
    {
      "id": "V21",
      "title": "Integrated Report 2024, Strategy by Business: Material and Engineering Business",
      "publisher": "The Japan Steel Works",
      "source_type": "company_integrated_report",
      "published": "Not stated",
      "event_date": "Not separately stated",
      "statistical_period": "2024 integrated report; historical capabilities",
      "location": "Printed pp.34-35 / excerpt PDF p.17; downloaded and read with pypdf on 2026-10-13",
      "geography": "Japan and international supply",
      "units": "Product categories",
      "read_date": "2026-10-13",
      "support_and_limits": "Manufactures reactor-pressure-vessel and steam-generator components and turbine/generator shafts; Highlights steelmaking, forging, heat treatment and large machining, and notes standardisation limits in build-to-order production. Limit: Used for manufacturing processes and business types rather than 2026 capacity; unqualified market-leadership claims are excluded.",
      "url": "https://www.jsw.co.jp/pdf/en/ir/library/integrated/IntegratedReport2024_story.pdf"
    },
    {
      "id": "V22",
      "title": "Shanghai Electric Group Sustainability Report 2025",
      "publisher": "Shanghai Electric",
      "source_type": "company_sustainability_report",
      "published": "2026-03-30",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025",
      "location": "Printed p. 60 / PDF p. 61; Core clean technologies table",
      "geography": "China",
      "units": "Product/project participation",
      "read_date": "2026-10-13",
      "support_and_limits": "The report lists Guohe-series reactor-coolant pumps and nuclear-island/conventional-island equipment supplied to Zhangzhou unit 1. Limit: Used as company evidence of equipment roles; total group revenue is not nuclear revenue, and no ranking without a comparable denominator is adopted.",
      "url": "https://www.hkexnews.hk/listedco/listconews/sehk/2026/0330/2026033001419_c.pdf"
    },
    {
      "id": "V23",
      "title": "Plants: overseas nuclear projects",
      "publisher": "KHNP",
      "source_type": "company_project_page",
      "published": "Not stated",
      "event_date": "2025-06",
      "statistical_period": "Historical agreements and project status viewed 2026-10-13",
      "location": "Barakah and Czech sections",
      "geography": "UAE, Czech Republic, Egypt",
      "units": "Business roles; agreements",
      "read_date": "2026-10-13",
      "support_and_limits": "KHNP signed the final two-unit Dukovany contract in June 2025; Its Barakah role includes joint project management and operating-support/long-term-maintenance agreements; Its El-Dabaa scope covers turbine-island construction for four VVER-1200 units. Limit: Contract scope differs by project; operator total revenue does not identify equipment/service revenue; no publication date is displayed.",
      "url": "https://www.khnp.co.kr/eng/contents.do?key=4591"
    },
    {
      "id": "V24",
      "title": "Contract Signed on A/E Services for Dukovany Units 5&6 in the Czech Republic",
      "publisher": "KEPCO Engineering & Construction",
      "source_type": "company_contract_announcement",
      "published": "2025-12-29",
      "event_date": "2025-12-12",
      "statistical_period": "Dukovany 5 and 6 A/E contract",
      "location": "News",
      "geography": "Czech Republic; South Korea",
      "units": "EUR million",
      "read_date": "2026-10-13",
      "support_and_limits": "Signed the Dukovany 5/6 A/E-services contract with KHNP on December 12, 2025; Scope includes auxiliary-equipment procurement and licensing support. Limit: This subcontracted engineering scope is neither total project investment nor fully recognised 2025 revenue.",
      "url": "https://www.kepco-enc.com/board.es?act=view&bid=0039&list_no=44544&mid=a20501000000&tag="
    },
    {
      "id": "V25",
      "title": "Arabelle Solutions to supply Steam Turbine Island equipment for AP1000 at Poland's First Nuclear Power Plant",
      "publisher": "Arabelle Solutions",
      "source_type": "company_supplier_selection_release",
      "published": "2026-01-13",
      "event_date": "2026-01-13",
      "statistical_period": "Supplier selection for Poland project",
      "location": "PDF pp.1-2; selection and equipment scope",
      "geography": "Poland; international supply chain",
      "units": "Three turbine-generator sets",
      "read_date": "2026-10-13",
      "support_and_limits": "Bechtel and Westinghouse selected Arabelle to supply three turbine-generator sets and related turbine-island equipment for Poland; Arabelle is an EDF Group subsidiary. Limit: Selection does not establish full financing, construction start or commercial operation; no contract value is stated; do not compare its ranking with nuclear-island suppliers.",
      "url": "https://www.arabellesolutions.com/sites/simba/files/2026-01/Press%20Release%20-%20Arabelle%20Solutions%20to%20supply%20Steam%20Turbine%20Island%20equipment%20for%20AP1000%20in%20Poland%20_0.pdf"
    },
    {
      "id": "V26",
      "title": "Nuclear Energy",
      "publisher": "Kinectrics",
      "source_type": "company_business_page",
      "published": "Not stated",
      "event_date": "Not separately stated",
      "statistical_period": "Business description viewed 2026-10-13",
      "location": "Nuclear Energy Overview",
      "geography": "Global",
      "units": "Service categories",
      "read_date": "2026-10-13",
      "support_and_limits": "Provides materials/component testing, safety and licensing support, outage inspections, lifecycle and waste management. Limit: The service catalogue is not revenue segmentation; parent-company relationship is evidenced by V07.",
      "url": "https://www.kinectrics.com/solutions/energy-infrastructure/nuclear-energy"
    },
    {
      "id": "V27",
      "title": "Commercial Grade Dedication",
      "publisher": "Framatome Nuclear Parts Center",
      "source_type": "company_business_page",
      "published": "Not stated",
      "event_date": "Not separately stated",
      "statistical_period": "Business description viewed 2026-10-13",
      "location": "Challenge and Solution",
      "geography": "Global",
      "units": "Service categories",
      "read_date": "2026-10-13",
      "support_and_limits": "Safety-related parts require quality records, design compatibility and acceptance criteria; some OEMs reduce support or exit; Commercial-grade dedication, inspections and witnessed tests support qualification for nuclear use. Limit: Company guidance is not the governing regulation and does not imply unconditional acceptance of every commercial item in safety-related equipment.",
      "url": "https://npc.framatome.com/services/commercialgradededication"
    },
    {
      "id": "V28",
      "title": "License Renewal",
      "publisher": "Westinghouse",
      "source_type": "company_business_page",
      "published": "Not stated",
      "event_date": "Not separately stated",
      "statistical_period": "Service description viewed 2026-10-13",
      "location": "License Renewal main text",
      "geography": "Global",
      "units": "Service categories",
      "read_date": "2026-10-13",
      "support_and_limits": "Supports integrated plant assessment, time-limited aging analyses and environmental reporting; Licence extension requires regulatory approval. Limit: Supplier technical support does not replace regulatory approval; jurisdiction-specific rules require separate verification.",
      "url": "https://westinghousenuclear.com/operating-plants/engineered-solutions/license-renewal"
    },
    {
      "id": "V29",
      "title": "Long-term operations",
      "publisher": "Framatome",
      "source_type": "company_business_page",
      "published": "2025-10-05",
      "event_date": "Not separately stated",
      "statistical_period": "Service description viewed 2026-10-13",
      "location": "Official HTML introduction and product list; retrieved directly after web-tool failure; metadata modified 2026-03-13",
      "geography": "Global",
      "units": "Service categories",
      "read_date": "2026-10-13",
      "support_and_limits": "Long-term-operation services cover licence renewal, aging and asset management, modernisation and upgrades. Limit: The page describes capabilities rather than approval of a particular plant extension; publication date comes from structured page metadata.",
      "url": "https://www.framatome.com/solutions-portfolio/portfolio/solutions/plant-in-operation/long-term-operation"
    },
    {
      "id": "M01",
      "title": "Uranium Enrichment",
      "publisher": "World Nuclear Association",
      "source_type": "industry-association statistical table",
      "published": "2026-09-29 (page updated)",
      "event_date": "Not separately stated",
      "statistical_period": "2025 capacity column, sourced to Nuclear Fuel Report 2025",
      "location": "Enrichment capacity; World enrichment capacity table",
      "geography": "Global",
      "units": "thousand SWU/year",
      "read_date": "2026-10-13",
      "support_and_limits": "WNA, Uranium Enrichment, updated 2026-09-29; 2025 global capacity; thousand SWU/year; capacity table and footnote. Supports enrichment-capacity composition; CNNC is estimated. Rows total 68,077 versus reported 68,076; author calculations use rows. The source does not explain the difference. Capacity is not revenue or deliveries.",
      "url": "https://world-nuclear.org/information-library/nuclear-fuel-cycle/conversion-enrichment-and-fabrication/uranium-enrichment"
    },
    {
      "id": "M02",
      "title": "World Nuclear Power Reactors & Uranium Requirements",
      "publisher": "World Nuclear Association",
      "source_type": "primary",
      "published": "2026-10-08 (page updated)",
      "event_date": "2026-10-08 snapshot",
      "statistical_period": "Reactor status as of update; nuclear generation 2025 separately",
      "location": "WORLD row; column headers; Notes",
      "geography": "Global",
      "units": "reactors; MWe (net for operable, gross for construction)",
      "read_date": "2026-10-13",
      "support_and_limits": "WNA, World Nuclear Power Reactors & Uranium Requirements, updated 2026-10-08; global status snapshot; reactors/MWe; WORLD row and Notes. Supports fleet and construction indicators. Operable means grid-connected; construction includes suspended projects. Operable capacity is net and construction capacity gross; do not sum them.",
      "url": "https://world-nuclear.org/information-library/facts-and-figures/world-nuclear-power-reactors-and-uranium-requireme"
    },
    {
      "id": "M03",
      "title": "Full year 2025 audited financial results",
      "publisher": "Urenco",
      "source_type": "primary",
      "published": "2026-03-12",
      "event_date": "2025-12-31 financial year end",
      "statistical_period": "FY2025",
      "location": "Financial highlights and Outlook and Order Book",
      "geography": "Global",
      "units": "EUR million; EUR billion",
      "read_date": "2026-10-13",
      "support_and_limits": "Urenco, Full year 2025 audited financial results, published 2026-03-12; FY2025/2025-12-31 backlog; global group; EUR; Financial highlights/Outlook. Supports €2,096.2m revenue and €21.3bn backlog. Backlog spans multiple years; group scope and exchange-rate effects prevent treating it as annual segment-market size.",
      "url": "https://www.urenco.com/news/financial/2026/full-year-2025-audited-results"
    },
    {
      "id": "M04",
      "title": "Half year 2026 unaudited financial results",
      "publisher": "Urenco",
      "source_type": "primary",
      "published": "2026-08-13",
      "event_date": "2026-06-30 interim financial period end",
      "statistical_period": "H1 2026",
      "location": "Summary and Outlook/Order Book",
      "geography": "Global",
      "units": "EUR million; EUR billion",
      "read_date": "2026-10-13",
      "support_and_limits": "Urenco, Half year 2026 unaudited financial results, published 2026-08-13; H1 2026/2026-06-30; global group; EUR; Summary/backlog discussion. Supports €27.3bn backlog, €645.4m revenue and the delivery-timing explanation. Unaudited; do not mechanically annualize or infer falling demand from one revenue period.",
      "url": "https://www.urenco.com/news/global/2026/half-year-2026-unaudited-financial-results"
    },
    {
      "id": "M05",
      "title": "Orano Annual Activity Report 2025",
      "publisher": "Orano",
      "source_type": "primary",
      "published": "2026 (exact publication date not displayed in opened PDF)",
      "event_date": "2025 reporting year; expansion dates separately",
      "statistical_period": "FY2025; prospective expansion 2028-2030",
      "location": "Printed p.39 (PDF page index 40), section 2.3.2 Front End",
      "geography": "Global",
      "units": "million SWU/year; EUR billion",
      "read_date": "2026-10-13",
      "support_and_limits": "Orano, Annual Activity Report 2025, issued 2026; exact PDF publication date not displayed; FY2025 and 2028–2030 expansion plans; French facility/global customers; million SWU/year; printed p.39. Supports 7.5 million existing capacity, 2.5 million expansion and its schedule. Expansion is prospective; the approximately 50-million-SWU demand market described in the report cannot replace the WNA capacity denominator.",
      "url": "https://cdn.orano.group/orano/docs/default-source/orano-doc/finance/publications-financieres-et-reglementees/2025/orano_-annual-activity-report-2025_mel.pdf?sfvrsn=316136e0_24"
    },
    {
      "id": "M06",
      "title": "Orano 2026 Half-year Results",
      "publisher": "Orano",
      "source_type": "primary",
      "published": "2026-07-31",
      "event_date": "2026-06-30",
      "statistical_period": "H1 2026",
      "location": "Printed pp.2-3 (PDF indices 1-2); Appendix 1 pp.9-10",
      "geography": "Global",
      "units": "EUR million; EUR billion",
      "read_date": "2026-10-13",
      "support_and_limits": "Orano, 2026 Half-year Results, published 2026-07-31; H1/2026-06-30; global group; EUR; printed pp.2–3 and definitions. Supports €2,696m revenue, €34,393m backlog and €619m Front End revenue. Group figures include mining; Front End combines conversion and enrichment. Neither is a pure enrichment/equipment market total; backlog is a multi-year valuation.",
      "url": "https://cdn.orano.group/orano/docs/default-source/orano-doc/finance/publications-financieres-et-reglementees/2026/r%C3%A9sultats-semestriels-2026/20260731_orano2026half-year-results.pdf?sfvrsn=3df142da_4"
    },
    {
      "id": "M07",
      "title": "EDF Management Report 2025",
      "publisher": "EDF",
      "source_type": "primary",
      "published": "2026-02-20 (2025 annual results release)",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025",
      "location": "Printed p.10 of 17 (PDF index 9), Industry and services; p.11 (PDF index10) EBITDA",
      "geography": "Global",
      "units": "EUR million; EUR billion",
      "read_date": "2026-10-13",
      "support_and_limits": "EDF, Management Report 2025, released with results on 2026-02-20; FY2025; global Framatome/Arabelle; EUR; printed pp.10–11. EDF reports €5,372m Framatome sales versus €5,399m in M12. A complete revenue reconciliation is not provided in the reviewed texts. The narrative consistently uses M12.",
      "url": "https://www.edf.fr/sites/groupe/files/2026-02/edf-annual-results-2025-management-report.pdf"
    },
    {
      "id": "M08",
      "title": "EDF 2026 half-year results press release",
      "publisher": "EDF",
      "source_type": "primary",
      "published": "2026-07-31",
      "event_date": "2026-06-30",
      "statistical_period": "H1 2026",
      "location": "Printed p.6 (PDF index 5), Industry and services",
      "geography": "Global",
      "units": "EUR million; EUR billion",
      "read_date": "2026-10-13",
      "support_and_limits": "EDF, 2026 half-year results, published 2026-07-31; H1 2026; global Framatome; EUR; printed p.6. Supports order intake of about €2.7bn and contributions from Installed Base/Fuel activities and EPR2 component production. Industry and services sales include other businesses and cannot be labelled Framatome sales; EBITDA, revenue and orders are distinct measures.",
      "url": "https://www.edf.fr/sites/groupe/files/2026-07/2026-07-31-edf-half-year-results-pr.pdf"
    },
    {
      "id": "M09",
      "title": "GE Vernova 2025 Annual Report and Form 10-K",
      "publisher": "GE Vernova",
      "source_type": "primary",
      "published": "2026 (January 30 release is listed by official search metadata; exact PDF publication date not displayed)",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025",
      "location": "Form 10-K printed pp.5,26 (PDF indices 16,37), Power business description and revenue by business unit",
      "geography": "Global",
      "units": "USD million",
      "read_date": "2026-10-13",
      "support_and_limits": "GE Vernova, 2025 Annual Report/10-K, issued 2026; FY2025; global; USD; 10-K printed pp.5 and 26. Supports Nuclear Power revenue of US$1,018m and BWR, fuel and SMR scope. Some nuclear-turbine activities sit in Steam Power, which also includes coal; total group/Power revenue is not nuclear revenue.",
      "url": "https://www.gevernova.com/sites/default/files/gevernova_2025_annual_report.pdf"
    },
    {
      "id": "M10",
      "title": "BWX Technologies Form 10-K, fiscal year 2025",
      "publisher": "BWX Technologies; U.S. Securities and Exchange Commission filing",
      "source_type": "primary",
      "published": "2026-02-23 (Form 10-K signature date)",
      "event_date": "2025-12-31",
      "statistical_period": "FY2025",
      "location": "Item 7, Commercial Operations; Form 10-K printed p.36",
      "geography": "Global",
      "units": "USD million",
      "read_date": "2026-10-13",
      "support_and_limits": "BWXT, FY2025 Form 10-K, signed 2026-02-23; FY2025; global group; USD; printed p.36, Commercial Operations. Supports US$853.070m revenue and US$231.0m acquisition contribution. Commercial Operations includes medical activities; group scope includes government/naval nuclear work. Growth is not entirely organic, and these figures cannot establish pure civil nuclear-power shares.",
      "url": "https://www.sec.gov/Archives/edgar/data/1486957/000148695726000007/bwxt-20251231.htm"
    },
    {
      "id": "M11",
      "title": "EDF Universal Registration Document 2025, Framatome activities",
      "publisher": "EDF",
      "source_type": "primary",
      "published": "2026-04-02 (English PDF file date; French document filed 2026-03-31)",
      "event_date": "2025 operating year",
      "statistical_period": "FY2025",
      "location": "Printed pp.41-43 (PDF indices40-42), section 1.4.1.1.4 Framatome",
      "geography": "Global",
      "units": "reactors; qualitative product scope",
      "read_date": "2026-10-13",
      "support_and_limits": "EDF, Universal Registration Document 2025, English PDF dated 2026-04-02; FY2025; global Framatome; product scope/reactors; printed pp.41–43. Supports nuclear steam-supply systems, instrumentation and control, fuel and operating-plant services, and work on more than 380 reactors. Service coverage overlaps and is not exclusive share; company scope also includes defence and healthcare.",
      "url": "https://www.edf.fr/sites/groupe/files/2026-04/2026-04-02-urd-edf-2025-en.pdf"
    },
    {
      "id": "M12",
      "title": "Framatome reports 2025 financial results",
      "publisher": "Framatome",
      "source_type": "primary company annual-results press release",
      "published": "2026-03-04",
      "event_date": "2025-12-31 financial-year end",
      "statistical_period": "FY2025",
      "location": "Financial table and narrative",
      "geography": "Global",
      "units": "EUR million",
      "read_date": "2026-10-13",
      "support_and_limits": "Framatome, Framatome reports 2025 financial results, published 2026-03-04; FY2025; global group; EUR; financial table, commentary and EBITDA footnote. Supports €5,399m revenue, €5,924m orders and €665m EBITDA. The footnote explains adjustments versus EDF's €641m EBITDA; it does not separately reconcile the revenue difference. Adjacent businesses prevent treating group revenue as a pure nuclear-power market share.",
      "url": "https://www.framatome.com/medias/framatome-reports-2025-financial-results/"
    },
    {
      "id": "I01",
      "title": "03210491 Inside the reactor hall at Dukovany Nuclear Power Plant",
      "publisher": "IAEA Imagebank",
      "source_type": "primary_institutional_photograph",
      "published": "2013-03-18 uploaded",
      "event_date": "2012-11-06 photograph taken",
      "statistical_period": "Photograph of existing plant in 2012",
      "location": "IAEA original photo description, date metadata, licensing link and Original size page",
      "geography": "Dukovany, Czech Republic",
      "units": "3000 × 2000 pixels",
      "read_date": "2026-10-13",
      "support_and_limits": "IAEA Imagebank photograph 03210491 by Petr Pavlicek / IAEA, taken 2012-11-06 and uploaded 2013-03-18. The original-size page and downloaded JPEG both show 3000 × 2000 pixels. The source page links CC BY-SA 2.0, permitting redistribution with attribution and its licence. The original file is included unchanged and displayed proportionally. It depicts the existing Dukovany plant and cannot prove later new-build progress or supplier relationships. Licence https://creativecommons.org/licenses/by-sa/2.0/ . Original https://live.staticflickr.com/8234/8567099193_0272213db3_o.jpg .",
      "url": "https://www.flickr.com/photos/iaea_imagebank/8567099193/"
    }
  ]
}